FROM EQUIPMENT TO WORKING SPACE
Freeze Dryer 3D Factory Layouts
Explore SDG equipment layouts and follow the material flow from preparation to freezing, drying, unloading and cleaning.
SDG350
One operator and one transfer cart serve two alternating batches of one rack each.
- Building reference
- 16 × 10 m
- Racks per batch
- 1
SDG700
One operator and one transfer cart serve two alternating batches of 2 racks each.
- Building reference
- 24.4 × 18.4 m
- Racks per batch
- 2
SDG1100
One operator and one transfer cart serve two alternating batches of 3 racks each.
- Building reference
- 24.4 × 30.4 m
- Racks per batch
- 3
SDG1600
Two alternating batches of 3 carts connect freezing, drying and cleaning along one suspended rail.
- Building reference
- 30.4 × 24.4 m
- Racks per batch
- 3
SDG3000
Two alternating batches of 6 carts connect freezing, drying and cleaning along one suspended rail.
- Building reference
- 36.4 × 24.4 m
- Racks per batch
- 6
SDG6000
Two alternating batches of 12 carts connect freezing, drying and cleaning along one suspended rail.
- Illustrated footprint
- ≈ 42.0 × 22.1 m
- Racks per batch
- 12
Building dimensions are layout references. The final arrangement depends on your factory and supporting process areas.
Plan a layout for your factory
Share your product, batch target and building dimensions to discuss a suitable equipment arrangement.