3D FACTORY LAYOUT & MATERIAL FLOW
SDG3000 3D Factory Layout
Two alternating batches of 6 carts connect freezing, drying and cleaning along one suspended rail.
- Building reference
- 36.4 × 24.4 m
- Racks per batch
- 6
Factory layout & production flowSuspended-rail transfer

Loading SDG3000…
Drag or zoom to explore · Flow camera resumes automatically
Raw materialFrozenFreeze-dried
01Preparation
02Freezing
03Freeze Drying
04Unloading
05Cleaning
The layout and workflow are reference demonstrations. The final configuration depends on your project.
Make this layout work for your factory
Tell us your product, batch target, building dimensions and available utilities.