3D FACTORY LAYOUT & MATERIAL FLOW
SDG350 3D Factory Layout
One operator and one transfer cart serve two alternating batches of one rack each.
- Building reference
- 16 × 10 m
- Racks per batch
- 1
Factory layout & production flowManual transfer

Loading SDG350…
Drag or zoom to explore · Flow camera resumes automatically
Raw materialFrozenFreeze-dried
01Preparation
02Freezing
03Freeze Drying
04Unloading
05Cleaning
The building reference covers the main workshop. Preparation, unloading, packaging and outdoor cooling areas are arranged separately.
Make this layout work for your factory
Tell us your product, batch target, building dimensions and available utilities.